Available now
Ready-Mix Concrete Operations
Order/pour scheduling, batch/delivery tickets, wait time, and per-yard margin for ready-mix producers and dispatch.
Workflow
- Customer/Jobsite
- Quote/Price Agreement
- Order/Pour
- Mix and Quantity
- Production/Dispatch Schedule
- Truck/Driver Assignment
- Batch/Delivery Ticket
- Arrival/Waiting/Discharge/Water Addition/Return
- Ticket Approval
- Invoice
- Driver/Truck/Job Analysis
Who it’s for
Producer / Dispatcher
You produce ready-mix concrete and dispatch pours.
Mixer-Truck Owner / Hauler
You own or drive mixer trucks delivering for a producer.
Placement Contractor / Pump Coordinator
You coordinate placement and pump scheduling on the receiving end.
Dry Cement Hauler
You haul dry bulk cement by tanker — a distinct transport profile from wet ready-mix pour delivery.
Included tools
Every package includes the baseline modules below; the Package Builder adds more based on how you answer a short interview — see exactly why on your recommendation.
Setup Wizard
Business identity, role, team, rates, colors, logo, tax, deposits, statuses, and defaults.
Today / Quick Actions
Phone-first page showing overdue items, today's jobs, money due, messages, and shortcuts.
Dashboard
Revenue, costs, net result, workload, pipeline, receivables, operational alerts.
Leads
New opportunities, source, contact attempts, next action, probability, status.
Customers
Repeat clients and contacts, linked to jobs, quotes, and invoices by permanent ID.
Price Book
Services/items, billing units, internal cost, customer price, minimum, markup, tax setting.
Quotes
Pulls from the Price Book; shows customer total and expected profit before sending.
Invoices / Payments
Deposit, balance, due date, status, payment log, unpaid follow-up.
Expenses
Direct job cost, overhead, asset expense, category, receipt link.
Money
Operational P&L, cash timing, receivables, payables, reserves, allocation HUD.
Documents
One searchable index for all generated and uploaded records.
Messages
Customer, driver, carrier, crew, vendor, reminder, follow-up, and collection messages.
Reports
Period and role-specific KPIs.
Training
What to enter, what is automatic, what not to edit, example workflow.
Archive
Closed periods and inactive records; history is not deleted.
SettlementsAdded based on your answers
Calculates driver/carrier pay and tracks approval/payment.
Orders / PoursAdded based on your answers
Customer order, pour site, and delivery schedule.
Mix SpecificationsAdded based on your answers
Preserves the approved mix reference and revision as supplied — never generates a new mix design.
Batch TicketsAdded based on your answers
Ordered/dispatched/accepted/returned volume per truck load.
Truck Cycle TrackingAdded based on your answers
Arrival, unload start/end, and return timestamps per truck.
Dispatch SequenceAdded based on your answers
Planned truck sequence against the pour schedule.
Wait Time TrackingAdded based on your answers
Time beyond free unloading terms, linked to wait-fee billing.
Test Document LinksAdded based on your answers
Links to quality-testing documents — reviewed externally, not generated here.
Dry Cement HaulingAdded based on your answers
A distinct dry-bulk transport profile, separate from wet pour delivery fields.
Formulas
Every formula is versioned, documented, and tested — see a breakdown of where every number comes from in the demo.
| Metric | What it does | Nature |
|---|---|---|
| Line revenue | Quantity × unit price. | operational |
| Line cost | Quantity × unit cost. | operational |
| Gross profit | Revenue minus direct cost. | operational |
| Gross margin % | Gross profit ÷ revenue. Blank when revenue is zero. | operational |
| Markup % | (Price − Cost) ÷ Cost. Blank when cost is zero. | operational |
| Price from target margin | Cost ÷ (1 − Target margin). Blank/invalid when target margin is 100% or more (division by zero or negative). | operational |
| Subtotal | Sum of line revenue. | operational |
| Tax | Taxable subtotal × tax rate. | tax |
| Quote total | Subtotal + Tax + Approved fees − Discount. | operational |
| Deposit due | Quote total × deposit %. | operational |
| Remaining balance | Invoice total − Payments − Credits. | operational |
| Net operating result | Revenue − Direct costs − Operating expenses. | accounting |
| Budget variance | Actual − Budget. | operational |
| Collection rate | Cash collected ÷ Amount invoiced. Blank when nothing has been invoiced. | operational |
| Lead conversion | Won leads ÷ Qualified leads. Blank when there are no qualified leads. | operational |
| Weighted pipeline | Sum of (opportunity value × probability) across open opportunities. | operational |
| Days to payment | Paid date − Invoice date, in days. | operational |
| On-time rate | On-time completed records ÷ Completed records. Blank when nothing is completed. | operational |
| Pour volume (cubic yards) | (Length × width × depth in feet) ÷ 27. | operational |
| Order volume with quantity allowance | Pour volume × (1 + allowance ratio). | operational |
| Planned truck trips | Ceiling(order volume ÷ truck capacity) — never authority to overload a truck. | operational |
| Net accepted volume | Dispatched volume − returned volume. Billable quantity still follows contract and returned-load charge policy, not this figure alone. | operational |
Documents
- Order confirmation
- Mix specification reference
- Batch / delivery ticket
- Wait time log
- Test document index
- Customer invoice
- Hauler settlement
- Pour / truck / job analysis summary
What this does not do
- Ticket/quality-control fields require review by a qualified producer before use; they do not by themselves represent ASTM C94 compliance.
Ready to see your recommendation?
Answer a short interview and get a role-specific package with plain-language reasons for every module — or try the connected demo first.